Skip to content

Approved, not started · Edinburgh

Granton Waterfront Regeneration (masterplan)

Granton, Edinburgh · EH5

ConsentedLow confidence

Homes

3,500

On the map, not added to the totals

Still to build

3,500

consented but not started, so all of it is still to build

Announced by the developer or the press but not yet in a council schedule, so it is shown on the map but left out of the homes total.

Where it is

The pin is approximate: placed on the postcode area or the town centre, not the site boundary. Scroll the page over the map; hold Ctrl to zoom it.

About the site

Builder
Cruden Homes / City of Edinburgh Council / EDI Group
Tenure
45% affordable / 55% private (phase 1)
Sales status
First phase approved, construction ongoing
Completion
phase 1 delivery 2025-2032; wider masterplan longer term
Where the pin is
Approximate. Placed on the postcode area or the town centre, not the site boundary.
Position
From its postcode area

Notes

GBP1.3bn, 120-acre regeneration, city's largest brownfield site. First phase (847 homes) approved November 2024, developer Cruden Homes with City of Edinburgh Council. Includes primary school, low-carbon heat network, 20,000 sqm commercial/cultural space, coastal park. Architects incl. Smith Scott Mullan, C.F. Moller, Collective Architecture, Studio for New Realities, ADP, Cooper Cromar.

Where this comes from

Developer and press research. From developer or council announcements; the pin is placed on the postcode area or the town, so it is indicative only.

A home to sell before you buy?

A move to a new home in Granton starts with the one you own now: what it would sell for, or what it would let for if you kept it. Enter its postcode and the figure is on your screen.

Both are free and instant on screen. No email needed to see the number.